Hey guys, this is blog post 5, and I’m currently working on the methods seminar, which is some type of presentation that has to do with presenting the methods of my project. Apparently it was postponed to Thursday due to Mrs. Pearson being absent, but it definitely works for me. I’ve been having lots of class/homework recently, but the main assignment I’ve been having trouble on is the website for Capstone. For now it’s taking quite a while to set up the format of the website. Basically I’m still deciding on where to put my topics for it, but I already have most of the contents (aside from the results of my project).
Speaking of which, I’m still in my waiting game for the materials. The plastic cups that I found last time apparently had expensive shipping (20 dollars worth for a 5 dollar cup pack, not sure why), so I will be searching for more plastic cups at some stores. The egg farm that I mentioned earlier had a coyote problem recently so those will also take longer apparently. Most likely I have to look for a different egg farm. The PMP wrap will be delivered by my grandparents since the US doesn’t have that type of material. Hopefully I’ll be able to start the project soon…
Tags: Independence, Planning, Productivity
Comments